{"id":1693,"date":"2023-02-03T15:05:53","date_gmt":"2023-02-03T14:05:53","guid":{"rendered":"https:\/\/moov.law\/?p=1693"},"modified":"2023-07-14T10:09:23","modified_gmt":"2023-07-14T08:09:23","slug":"arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener","status":"publish","type":"post","link":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/","title":{"rendered":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Le 15 d\u00e9cembre dernier, le Gouvernement Bruxellois a adopt\u00e9 un arr\u00eat\u00e9 modifiant l&#8217;arr\u00eat\u00e9 du 17 d\u00e9cembre 2015 relatif \u00e0 la promotion de l&#8217;\u00e9lectricit\u00e9 verte<a href=\"#_ftn1\" id=\"_ftnref1\">[1]<\/a> (l\u2019\u00ab<strong>Arr\u00eat\u00e9<\/strong>&nbsp;\u00bb).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ce dernier transpose partiellement la directive 2018\/2001 (UE) du Parlement europ\u00e9en et du Conseil du 11 d\u00e9cembre 2018 relative \u00e0 la promotion de l&#8217;utilisation de l&#8217;\u00e9nergie produite \u00e0 partir de sources renouvelables<a href=\"#_ftn2\" id=\"_ftnref2\">[2]<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jusqu&#8217;\u00e0 pr\u00e9sent, pour b\u00e9n\u00e9ficier de certificats verts, il fallait que seule l&#8217;installation<a id=\"_ftnref3\" href=\"#_ftn3\">[3]<\/a> de production d\u2019\u00e9lectricit\u00e9 verte fasse l\u2019objet d\u2019une certification pr\u00e9alable. Ce syst\u00e8me est dor\u00e9navant applicable \u00e9galement aux installations de production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En effet, il devenait n\u00e9cessaire de proc\u00e9der aux modifications de certains articles de l\u2019arr\u00eat\u00e9 du 17 d\u00e9cembre 2015 d\u00e8s lors que de nombreux textes l\u00e9gislatifs et r\u00e9glementaires traitaient de sujets relatifs \u00e0 l\u2019organisation des r\u00e9seaux d\u2019\u00e9nergie thermique et \u00e0 la comptabilisation de l\u2019\u00e9nergie thermique ainsi qu\u2019\u00e0 l\u2019organisation du march\u00e9 du gaz.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ce syst\u00e8me de certification pr\u00e9alable permet d\u2019attester que l\u2019installation de production d\u2019\u00e9nergie thermique ou l\u2019installation de gaz issus de sources renouvelables situ\u00e9e sur le territoire de la R\u00e9gion de Bruxelles-Capitale&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>est une installation de production d\u2019\u00e9nergie issue de sources renouvelables&nbsp;;<\/li>\n\n\n\n<li>est conforme aux normes&nbsp;et prescriptions applicables \u00e0 ces installations&nbsp;;<\/li>\n\n\n\n<li>dispose d\u2019une conception permettant de comptabiliser les quantit\u00e9s d\u2019\u00e9nergies produites.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Demande de certification<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019Arr\u00eat\u00e9 fait la distinction entre les certifications des installations de production d\u2019\u00e9nergie thermique issu de sources renouvelables et les certifications des installations de production de gaz issu de sources renouvelables&nbsp;mais en r\u00e9alit\u00e9, il s\u2019agit de la m\u00eame proc\u00e9dure&nbsp;<a id=\"_ftnref4\" href=\"#_ftn4\">[4]<\/a>&nbsp;:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>I. <\/strong>Les demandes sont effectu\u00e9es par l\u2019interm\u00e9diaire d\u2019un formulaire<a id=\"_ftnref5\" href=\"#_ftn5\">[5]<\/a> \u00e9tabli et mis \u00e0 disposition par l&#8217;autorit\u00e9 bruxelloise de r\u00e9gulation dans les domaines de l&#8217;\u00e9lectricit\u00e9, du gaz et du contr\u00f4le du prix de l&#8217;eau (BRUGEL). Ledit formulaire sera adress\u00e9 \u00e0 un organisme certificateur agr\u00e9\u00e9 <a id=\"_ftnref6\" href=\"#_ftn6\">[6]<\/a> qui en accusera r\u00e9ception dans un d\u00e9lai d&#8217;un jour ouvrable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;A noter que la certification est r\u00e9alis\u00e9e aux frais du titulaire de l&#8217;installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>II. <\/strong>Le demandeur devra joindre au formulaire les documents suivants :<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. une facture d\u00e9taill\u00e9e relative \u00e0 l&#8217;installation&nbsp;<a id=\"_ftnref7\" href=\"#_ftn7\">[7]<\/a>;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. une copie d&#8217;un document d&#8217;identit\u00e9 du propri\u00e9taire de l&#8217;installation;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. les sch\u00e9mas pertinents aff\u00e9rents \u00e0 l&#8217;installation consid\u00e9r\u00e9e ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. les fiches techniques relatives \u00e0 l&#8217;installation et \u00e0 ses composants et notamment :<ul><li>les fiches techniques de l&#8217;ensemble des instruments de mesure ou, \u00e0 d\u00e9faut, les \u00e9l\u00e9ments d&#8217;information permettant d&#8217;appr\u00e9cier le degr\u00e9 de pr\u00e9cision et les conditions de pose de ceux-ci;<\/li><\/ul><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><ul><li>la fiche technique de l&#8217;unit\u00e9 de production;<\/li><\/ul><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><ul><li>des documents justificatifs d\u00e9montrant que les instruments de mesure respectent la Directive 2014\/32\/EU du 26 f\u00e9vrier 2014 sur les instruments de mesure (MID)<a id=\"_ftnref8\" href=\"#_ftn8\">[8]<\/a><span style=\"color: initial;\">;<\/span><\/li><\/ul><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. l&#8217;attestation par le gestionnaire du r\u00e9seau d&#8217;\u00e9nergie thermique que, conform\u00e9ment aux normes et prescriptions applicables, les travaux de raccordement, en ce compris le placement d&#8217;un compteur de production, ont \u00e9t\u00e9 r\u00e9alis\u00e9s;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. le cas \u00e9ch\u00e9ant, une copie du permis d&#8217;environnement ou du permis d&#8217;urbanisme<a id=\"_ftnref9\" href=\"#_ftn9\">[9]<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>III. <\/strong>A la suite du d\u00e9p\u00f4t du dossier, un examen par l&#8217;organisme certificateur est entrepris afin de constater la compl\u00e9tude de la demande. Dans le mois de la r\u00e9ception du dossier, l\u2019organisme informe le demandeur du caract\u00e8re complet ou non de sa demande.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans le cas o\u00f9 la demande serait incompl\u00e8te, l&#8217;organisme certificateur motive son examen aupr\u00e8s du demandeur et ce dernier dispose d&#8217;un d\u00e9lai de deux mois pour apporter les informations et\/ou les pi\u00e8ces manquantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>IV.<\/strong> Apr\u00e8s r\u00e9ception des informations et\/ou pi\u00e8ces compl\u00e9mentaires, l&#8217;organisme informe dans le mois le demandeur du caract\u00e8re complet ou non de sa demande mise \u00e0 jour.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>V. <\/strong>Ensuite, \u00e0 partir de la constatation du caract\u00e8re complet du dossier, l&#8217;organisme certificateur effectue, dans un d\u00e9lai d\u2019un mois, une visite de l&#8217;installation. Un rapport r\u00e9dig\u00e9 par l\u2019organisme conform\u00e9ment aux mod\u00e8les d\u00e9finis par BRUGEL en fonction des technologies utilis\u00e9es sera \u00e9tabli<a id=\"_ftnref10\" href=\"#_ftn10\">[10]<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>VI.<\/strong> Dans un d\u00e9lai maximal d&#8217;un mois \u00e0 dater de la visite, l&#8217;organisme certificateur d\u00e9livre au titulaire de l&#8217;installation une attestation de certification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>VII. <\/strong>En m\u00eame temps que l&#8217;envoi de l&#8217;attestation de certification au titulaire de l&#8217;installation, l&#8217;organisme certificateur transmet le double de l&#8217;attestation de certification ainsi que le dossier complet de certification \u00e0 BRUGEL qui attribue au titulaire de l&#8217;installation certifi\u00e9e un compte dans la banque de donn\u00e9es <a id=\"_ftnref11\" href=\"#_ftn11\">[11]<\/a> et qui y inscrit l&#8217;installation certifi\u00e9e.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-1600x1280.png\" alt=\"\" class=\"wp-image-1670\" width=\"637\" height=\"510\" srcset=\"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-1600x1280.png 1600w, https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-1280x1024.png 1280w, https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-768x614.png 768w, https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-1536x1228.png 1536w, https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/Image1-1-2048x1638.png 2048w\" sizes=\"auto, (max-width: 637px) 100vw, 637px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Droit aux garanties d\u2019origine<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une fois l\u2019attestation de certification obtenues, l\u2019installation permettra au titulaire de cette derni\u00e8re de b\u00e9n\u00e9ficier de Labels de Garanties d\u2019Origine (\u00ab&nbsp;<strong>LGO<\/strong>&nbsp;\u00bb).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Garantie d\u2019Origine (\u00ab&nbsp;<strong>GO<\/strong>&nbsp;\u00bb) est d\u00e9finie comme \u00e9tant un outil de tra\u00e7abilit\u00e9 mis en place au niveau europ\u00e9en visant \u00e0 fournir au consommateur final des informations claires sur l\u2019origine de l\u2019\u00e9nergie consomm\u00e9e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019octroi se fait sous forme immat\u00e9rielle, via l\u2019inscription d\u2019un titre de garanties d\u2019origine au cr\u00e9dit du compte du titulaire de l\u2019installation dans la banque de donn\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Il s\u2019agit donc pour faire simple d\u2019un document \u00e9lectronique servant \u00e0 prouver au client final qu\u2019une part d\u2019\u00e9nergie a \u00e9t\u00e9 produite \u00e0 partir de sources renouvelables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Il existe un march\u00e9 des GO qui permet l\u2019achat et la vente des certificats. Les GO sont valoris\u00e9es par les op\u00e9rateurs de march\u00e9. Elles peuvent \u00eatre vendues par le producteur ind\u00e9pendamment de l\u2019\u00e9lectricit\u00e9 produite. Les transactions sont inscrites dans des registres \u00e9lectroniques contr\u00f4l\u00e9s par les autorit\u00e9s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A noter que les GO ont une dur\u00e9e de validit\u00e9 de douze mois commen\u00e7ant \u00e0 la date de la fin de la p\u00e9riode de production concern\u00e9e, apr\u00e8s laquelle elles ne sont plus utilisables <a id=\"_ftnref12\" href=\"#_ftn12\">[12]<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Modification<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Il est important de sp\u00e9cifier les points suivants&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Toute modification apport\u00e9e \u00e0 l&#8217;installation ou \u00e0 l&#8217;un de ses composants qui n\u00e9cessite une certification est notifi\u00e9e \u00e0 BRUGEL dans les quinze jours&nbsp;;<\/li>\n\n\n\n<li>Une extension par augmentation de la puissance de l&#8217;installation doit faire l&#8217;objet d&#8217;une demande de certification&nbsp;;<\/li>\n\n\n\n<li>Le d\u00e9placement de tout ou partie d&#8217;une installation existante doit faire l&#8217;objet d&#8217;une demande de certification.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Contr\u00f4le<\/u><\/strong><a href=\"#_ftn13\" id=\"_ftnref13\">[13]<\/a><strong><u><\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tous les cinq ans, une demande est faite par BRUGEL \u00e0 un organisme de contr\u00f4le certifi\u00e9 de proc\u00e9der aux v\u00e9rifications des donn\u00e9es qui ont permis la certification d\u2019une installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A la suite des v\u00e9rifications entreprises, un rapport de contr\u00f4le est r\u00e9dig\u00e9 par l\u2019organisme certificateur<a id=\"_ftnref14\" href=\"#_ftn14\">[14]<\/a> dans lequel il conclut \u00e0 la confirmation, l&#8217;adaptation ou le retrait de l&#8217;attestation de certification. Une copie de ce rapport et, \u00e9ventuellement, de l&#8217;attestation de certification adapt\u00e9e, est envoy\u00e9e au titulaire de l&#8217;installation ainsi qu&#8217;\u00e0 BRUGEL.<a id=\"_ftnref15\" href=\"#_ftn15\">[15]<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans le cas o\u00f9 le titulaire de l&#8217;installation refuserait de se soumettre au contr\u00f4le, il est possible pour BRUGEL de suspendre l&#8217;octroi de garanties d&#8217;origine jusqu&#8217;\u00e0 la r\u00e9ception du rapport.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans le cas o\u00f9 le rapport conclut au retrait de l&#8217;attestation, une notification est transmise par BRUGEL au titulaire de l&#8217;installation attestant du retrait de l&#8217;attestation \u00e0 d\u00e9faut d\u2019une r\u00e9gularisation au plus tard trois mois apr\u00e8s la r\u00e9ception de ladite notification. Durant cette p\u00e9riode, il y a une suspension de l&#8217;octroi des garanties d&#8217;origine. Si pendant le d\u00e9lai imparti, il y a une r\u00e9gularisation, une nouvelle visite de contr\u00f4le est entreprise (aux frais du titulaire de l&#8217;installation). Le rapport de contr\u00f4le confirmera ou non la r\u00e9gularisation. A d\u00e9faut de r\u00e9gularisation, BRUGEL retirera l&#8217;attestation et arr\u00eatera l&#8217;octroi de garanties d&#8217;origine \u00e0 la date de la suspension de l&#8217;octroi.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><u>Entr\u00e9e en vigueur<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cet arr\u00eat\u00e9 est entr\u00e9 en vigueur ce 1<sup>er<\/sup> f\u00e9vrier 2023, \u00e0 l\u2019exception de certaines dispositions<a id=\"_ftnref16\" href=\"#_ftn16\">[16]<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nous tenons \u00e0 votre pleine disposition pour vous conseiller \u00e0 ce sujet ou pour r\u00e9pondre \u00e0 toutes vos questions. <\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><strong>Evelyne Li\u00e9geois<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">Avocate<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><a href=\"mai&#108;&#116;&#111;&#58;&#x65;&#x76;&#x65;&#x6c;&#x79;&#x6e;&#x65;&#46;li&#101;&#103;&#101;&#111;&#105;&#x73;&#x40;&#x6d;&#x6f;&#x6f;&#x76;&#46;law\">e&#118;&#101;&#108;&#x79;&#x6e;&#x65;&#46;l&#105;&#101;&#x67;&#x65;&#x6f;&#x69;s&#64;&#109;&#111;&#x6f;&#x76;&#x2e;&#x6c;a&#119;<\/a><\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref1\" id=\"_ftn1\">[1]<\/a> Source&nbsp;: <a href=\"https:\/\/www.stradalex.com\/fr\/sl_src_publ_leg_be_moniteur\/toc\/leg_be_moniteur_fr_13012023_1\/doc\/mb2022043166\">https:\/\/www.stradalex.com\/fr\/sl_src_publ_leg_be_moniteur\/toc\/leg_be_moniteur_fr_13012023_1\/doc\/mb2022043166<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref2\" id=\"_ftn2\">[2]<\/a> Source&nbsp;: <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/FR\/TXT\/PDF\/?uri=CELEX:32018L2001\">https:\/\/eur-lex.europa.eu\/legal-content\/FR\/TXT\/PDF\/?uri=CELEX:32018L2001<\/a>&nbsp;; L\u2019\u00e9nergie issue de sources renouvelables peut \u00eatre d\u00e9finie comme suit :&nbsp;\u00ab&nbsp;<em>une \u00e9nergie produite \u00e0 partir de sources non fossiles renouvelables, notamment l&#8217;\u00e9nergie \u00e9olienne, l&#8217;\u00e9nergie solaire (solaire thermique et solaire photovolta\u00efque) et g\u00e9othermique, l&#8217;\u00e9nergie ambiante, l&#8217;\u00e9nergie mar\u00e9motrice, houlomotrice et d&#8217;autres \u00e9nergies marines, l&#8217;\u00e9nergie hydro\u00e9lectrique, la biomasse, les gaz de d\u00e9charge, les gaz des stations d&#8217;\u00e9puration d&#8217;eaux us\u00e9es et le biogaz<\/em>.&nbsp;\u00bb (Article 3 de l\u2019Arr\u00eat\u00e9).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a id=\"_ftn3\" href=\"#_ftnref3\">[3]<\/a> Une installation est un type de technologie (PV, Cogen, &#8230;) li\u00e9 \u00e0 un point de raccordement au r\u00e9seau, d\u00e9fini par son code EAN (<em>par ex<\/em>: Solaire photovolta\u00efque &amp; EAN).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref4\" id=\"_ftn4\">[4]<\/a> Articles 12 (installation de production d\u2019\u00e9nergie thermique) et 13 (installation de production de gaz) de l\u2019Arr\u00eat\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref5\" id=\"_ftn5\">[5]<\/a> Disponible sous ce lien&nbsp;: <a href=\"https:\/\/www.brugel.brussels\/documents\/forms\/rechercher\">https:\/\/www.brugel.brussels\/documents\/forms\/rechercher<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref6\" id=\"_ftn6\">[6]<\/a> La liste des Organismes Certificateurs Agr\u00e9\u00e9s (OCA) est disponible sur le site web de BRUGEL&nbsp;:&nbsp; <a href=\"https:\/\/www.brugel.brussels\/themes\/energies-renouvelables-11\/certification-dune-installation-34\">https:\/\/www.brugel.brussels\/themes\/energies-renouvelables-11\/certification-dune-installation-34<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref7\" id=\"_ftn7\">[7]<\/a> Dans le cas o\u00f9 la facture n&#8217;est pas \u00e9tablie au nom du propri\u00e9taire, une preuve du droit de propri\u00e9t\u00e9 sur l&#8217;installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref8\" id=\"_ftn8\">[8]<\/a> La directive MID (Measurement Instruments Directive) est une directive qui stipule que seuls les compteurs certifi\u00e9s MID peuvent servir \u00e0 facturer de l&#8217;\u00e9lectricit\u00e9&nbsp;; Retrouvez l\u2019enti\u00e8ret\u00e9 de la directive via ce lien&nbsp;: <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/fr\/TXT\/?uri=CELEX:32014L0032\">https:\/\/eur-lex.europa.eu\/legal-content\/fr\/TXT\/?uri=CELEX:32014L0032<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref9\" id=\"_ftn9\">[9]<\/a> Article 12 de l\u2019Arr\u00eat\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref10\" id=\"_ftn10\">[10]<\/a> Disponibles sous ce lien&nbsp;: <a href=\"https:\/\/www.brugel.brussels\/themes\/energies-renouvelables-11\/conditions-pour-la-certification-286\">https:\/\/www.brugel.brussels\/themes\/energies-renouvelables-11\/conditions-pour-la-certification-286<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref11\" id=\"_ftn11\">[11]<\/a> L\u2019Extranet de Brugel permet la gestion et la vente de Certificats Verts&nbsp;: <a href=\"https:\/\/extranet.brugel.brussels\/home\/\">https:\/\/extranet.brugel.brussels\/home\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref12\" id=\"_ftn12\">[12]<\/a> BRUGEL annule toute garantie d\u2019origine au plus tard six mois apr\u00e8s sa date de validit\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref13\" id=\"_ftn13\">[13]<\/a> Articles 18 et 19 de l\u2019Arr\u00eat\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref14\" id=\"_ftn14\">[14]<\/a> Suivant le mod\u00e8le \u00e9tablit par BRUGEL.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a id=\"_ftn15\" href=\"#_ftnref15\">[15]<\/a> A noter que si le rapport conclut \u00e0 l&#8217;adaptation ou au retrait de l&#8217;attestation en raison d&#8217;une non-conformit\u00e9 aux informations communiqu\u00e9es par le titulaire de l&#8217;installation, le contr\u00f4le est r\u00e9alis\u00e9 aux frais du titulaire de l&#8217;installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref16\" id=\"_ftn16\">[16]<\/a> Et notamment l\u2019article 13 de l\u2019Arr\u00eat\u00e9 (installation de production de gaz&nbsp; &#8211; processus de certification) produit ses effets le 1<sup>er<\/sup> janvier 2021 \u2013 Article 46 de l\u2019Arr\u00eat\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le 15 d\u00e9cembre dernier, le Gouvernement Bruxellois a adopt\u00e9 un arr\u00eat\u00e9 modifiant l&#8217;arr\u00eat\u00e9 du 17 d\u00e9cembre 2015 relatif \u00e0 la promotion de l&#8217;\u00e9lectricit\u00e9 verte[1] (l\u2019\u00abArr\u00eat\u00e9&nbsp;\u00bb)&#8230;.<\/p>\n","protected":false},"author":2,"featured_media":1696,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[163,166,212,213],"class_list":["post-1693","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-law","tag-bruxelles-en","tag-energie-en","tag-reglement-en","tag-verte-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov<\/title>\n<meta name=\"description\" content=\"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov\" \/>\n<meta property=\"og:description\" content=\"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/\" \/>\n<meta property=\"og:site_name\" content=\"moov\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-03T14:05:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-14T08:09:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"996\" \/>\n\t<meta property=\"og:image:height\" content=\"579\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"contact@moov.law\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"contact@moov.law\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/\"},\"author\":{\"name\":\"contact@moov.law\",\"@id\":\"https:\\\/\\\/moov.law\\\/#\\\/schema\\\/person\\\/b2ec0c78359ee74c54a90e0de6cb97a7\"},\"headline\":\"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables\",\"datePublished\":\"2023-02-03T14:05:53+00:00\",\"dateModified\":\"2023-07-14T08:09:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/\"},\"wordCount\":1801,\"publisher\":{\"@id\":\"https:\\\/\\\/moov.law\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg\",\"keywords\":[\"bruxelles\",\"\u00e9nergie\",\"r\u00e8glement\",\"verte\"],\"articleSection\":[\"Energy law\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/\",\"url\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/\",\"name\":\"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/moov.law\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg\",\"datePublished\":\"2023-02-03T14:05:53+00:00\",\"dateModified\":\"2023-07-14T08:09:23+00:00\",\"description\":\"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#primaryimage\",\"url\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg\",\"contentUrl\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg\",\"width\":996,\"height\":579},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/moov.law\\\/en\\\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/moov.law\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/moov.law\\\/#website\",\"url\":\"https:\\\/\\\/moov.law\\\/\",\"name\":\"moov\",\"description\":\"Cabinet d&#039;avocats nich\u00e9 au c\u0153ur de Bruxelles.\",\"publisher\":{\"@id\":\"https:\\\/\\\/moov.law\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/moov.law\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/moov.law\\\/#organization\",\"name\":\"moov.law\",\"url\":\"https:\\\/\\\/moov.law\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/moov.law\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/moov-logo.png\",\"contentUrl\":\"https:\\\/\\\/moov.law\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/moov-logo.png\",\"width\":1200,\"height\":800,\"caption\":\"moov.law\"},\"image\":{\"@id\":\"https:\\\/\\\/moov.law\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/moov-law\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/moov.law\\\/#\\\/schema\\\/person\\\/b2ec0c78359ee74c54a90e0de6cb97a7\",\"name\":\"contact@moov.law\",\"url\":\"https:\\\/\\\/moov.law\\\/en\\\/author\\\/contactmoov-law\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov","description":"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/","og_locale":"en_US","og_type":"article","og_title":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov","og_description":"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.","og_url":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/","og_site_name":"moov","article_published_time":"2023-02-03T14:05:53+00:00","article_modified_time":"2023-07-14T08:09:23+00:00","og_image":[{"width":996,"height":579,"url":"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg","type":"image\/jpeg"}],"author":"contact@moov.law","twitter_card":"summary_large_image","twitter_misc":{"Written by":"contact@moov.law","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#article","isPartOf":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/"},"author":{"name":"contact@moov.law","@id":"https:\/\/moov.law\/#\/schema\/person\/b2ec0c78359ee74c54a90e0de6cb97a7"},"headline":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables","datePublished":"2023-02-03T14:05:53+00:00","dateModified":"2023-07-14T08:09:23+00:00","mainEntityOfPage":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/"},"wordCount":1801,"publisher":{"@id":"https:\/\/moov.law\/#organization"},"image":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#primaryimage"},"thumbnailUrl":"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg","keywords":["bruxelles","\u00e9nergie","r\u00e8glement","verte"],"articleSection":["Energy law"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/","url":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/","name":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables - moov","isPartOf":{"@id":"https:\/\/moov.law\/#website"},"primaryImageOfPage":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#primaryimage"},"image":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#primaryimage"},"thumbnailUrl":"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg","datePublished":"2023-02-03T14:05:53+00:00","dateModified":"2023-07-14T08:09:23+00:00","description":"Nich\u00e9 au c\u0153ur du centre historique de Bruxelles, au sein des c\u00e9l\u00e8bres Galeries Saint-Hubert, moov.law est un cabinet de proximit\u00e9, \u00e0 taille humaine, dont les valeurs sont l\u2019excellence, le pragmatisme, la transparence, le sens du service et le bien-\u00eatre de ses membres.","breadcrumb":{"@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#primaryimage","url":"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg","contentUrl":"https:\/\/moov.law\/wp-content\/uploads\/2023\/02\/lampe-led-blocs-bois-texte-energie-verte-fond-vert_292052-1367.jpg","width":996,"height":579},{"@type":"BreadcrumbList","@id":"https:\/\/moov.law\/en\/arrete-du-gouvernement-de-la-region-de-bruxelles-capitale-du-15-decembre-2022-conditions-et-procedures-concernant-le-systeme-de-certification-prealable-mis-en-place-pour-la-production-dener\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/moov.law\/en\/"},{"@type":"ListItem","position":2,"name":"Arr\u00eat\u00e9 du Gouvernement de la R\u00e9gion de Bruxelles-Capitale du 15 d\u00e9cembre 2022 : conditions et proc\u00e9dures concernant le syst\u00e8me de certification pr\u00e9alable mis en place pour la production d\u2019\u00e9nergie thermique et de gaz issus de sources renouvelables"}]},{"@type":"WebSite","@id":"https:\/\/moov.law\/#website","url":"https:\/\/moov.law\/","name":"moov","description":"Cabinet d&#039;avocats nich\u00e9 au c\u0153ur de Bruxelles.","publisher":{"@id":"https:\/\/moov.law\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/moov.law\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/moov.law\/#organization","name":"moov.law","url":"https:\/\/moov.law\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/moov.law\/#\/schema\/logo\/image\/","url":"https:\/\/moov.law\/wp-content\/uploads\/2021\/11\/moov-logo.png","contentUrl":"https:\/\/moov.law\/wp-content\/uploads\/2021\/11\/moov-logo.png","width":1200,"height":800,"caption":"moov.law"},"image":{"@id":"https:\/\/moov.law\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/moov-law"]},{"@type":"Person","@id":"https:\/\/moov.law\/#\/schema\/person\/b2ec0c78359ee74c54a90e0de6cb97a7","name":"contact@moov.law","url":"https:\/\/moov.law\/en\/author\/contactmoov-law\/"}]}},"_links":{"self":[{"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/posts\/1693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/comments?post=1693"}],"version-history":[{"count":3,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/posts\/1693\/revisions"}],"predecessor-version":[{"id":2210,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/posts\/1693\/revisions\/2210"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/media\/1696"}],"wp:attachment":[{"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/media?parent=1693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/categories?post=1693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/moov.law\/en\/wp-json\/wp\/v2\/tags?post=1693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}